Projects

Refurbishment of tracks and platforms at Madrid Chamartín Station and new commuter lobby beneath the tracks at the northern end.

Property:

ADIF

Client:

UTE Estación de Chamartín

Year:

2025

Engineering:

INECO

Location:

Madrid-Chamartín Clara Campoamor

Facilities Description:

Medium and Low Voltage Installations
  • General and distribution panels
  • Power and lighting
  • Utility transformer and distribution substation 400 kVA
  • Customer transformer substation 2×630 kVA
  • Earthing network
  • Outdoor lighting