Projects

Cuenca University Hospital

Property:

Sescam

Client:

UTE Hosp. Cuenca (OHL – Sarrión y Constru. Carrascosa de Cuenca)

Year:

2024

Engineering:

PROMEC

Location:

Camino Terminillo, s/n, 16004 Cuenca

General Information:

Area: 98,000 m² / Operating rooms: 11

Facilities Description:

Medium and Low Voltage Installations, and Special Installations
  • Lighting and power installations
  • General and distribution panel
  • Lighting and illumination
  • Fire detection
  • Public address system
  • 3 generator sets of 1400 kVA each
  • Transformer substation 3×1000 kVA
  • Transformer substation 12×1250 kVA